Stage 3 — Buy Materials

The purchase-order lifecycle, approval limits and escalation, GST, MOQ warnings, and supplier PDFs.

Stage 3 manages purchase orders for raw materials. Draft POs created by Stage 2 shortfalls land here automatically; you can also raise POs from scratch. QC managers have no access to this stage. Each PO gets a human-readable number in the form PO-2026-0042.

Lifecycle

StatusMeaning
draftEditable; not yet submitted
pending approvalSubmitted above the creator's limit — waiting for the org admin
approvedCleared to send
sentSent to the supplier
partially receivedSome lines received via GRNs in Stage 4
closedFully received
cancelledVoided — only possible while NO goods have been received against it

Approval limits

Each role can approve POs up to a limit, compared against the pre-tax subtotal. Defaults: QC manager ₹25,000 (USD orgs: $300), production lead ₹50,000 ($600), admin unlimited — your admin can change these in Settings → Approvals. A PO above your limit is not blocked: it moves to pending approval and the admin is notified.

GST and MOQ

Each line can carry a GST rate — it defaults from the material's configured rate and can be overridden per line. Totals show the pre-tax subtotal and GST separately. If a line's quantity is below the material's minimum order quantity, you get a warning — it never blocks the PO, since MOQs are often negotiable.

The supplier PDF

Approved POs generate a PDF with your company identity (name, GSTIN, address, logo — set in Settings → General), line items, and the GST breakdown, ready to send to the supplier.

Buying for the whole week from a spreadsheet? "Bulk import orders" (also in Settings → Import) loads a CSV/XLSX of PO lines grouped by supplier — every imported PO lands as a DRAFT and goes through this exact approval flow.

Bulk-importing purchase orders